Boiler Pipe Purging Steam Blowing Target Plate Mirror Aluminum

Ask Latest Price
Video Channel
Brand Name :Ze Xu
Model Number :based on customer's needs
Certification :ISO9000
Place of Origin :Yanshan, Hebei, China
MOQ :1Pcs
Price :USD 10-100 per piece
Payment Terms :T/T
Supply Ability :100,000 tons per month
Delivery Time :3-7 Working day
Packaging Details :Wooden box, pallet or according to customer requirements
Material :Aluminum
Applied to :pipe purge
thickness :5mm、6mm、8mmm、10mm
Features :mirror finish
more
Contact Now

Add to Cart

Find Similar Videos
Auxiliary Purging Of Boiler Pipe S235JR Steam Blowing Target Plate 00:07
Auxiliary Purging Of Boiler Pipe S235JR Steam Blowing Target Plate
View Product Description

Boiler Pipe Steam Purging Mirror Aluminum Target, Aluminum Target, Aluminum Plate

After the piping system is installed, it can be blown by air or steam according to the working conditions of the working medium and the degree of dirt on the inner surface of the pipe. The general requirements for pipe purge are:

Equipment and pipes that are not allowed to be purged should be isolated from the purging system.

Before the pipeline is purged, orifice plates, flange-connected regulating valves, main valves, throttle valves, safety valves, instruments, etc. should not be installed. For the above-mentioned valves and instruments connected by welding, the bypass should be used or the seal should be removed. Protective measures such as pieces of equipment.

The order of purging should be carried out in the order of main pipe, branch pipe, and drain pipe. The blown out dirt must not enter the pipes that have been purged.

The dirt discharged by purging shall not pollute the environment, and random discharge is strictly prohibited.

A restricted area should be set before purging.

After the pipeline has passed the purging, other operations that affect the cleaning shall not be carried out.

Boiler Pipe Purging Steam Blowing Target Plate Mirror Aluminum

Purging requirements:
1. After the strength test of the piping system, before the air pressure tightness test, purge and clean should be carried out in sections
2. The method of purging should be determined according to the requirements for the use of the pipeline, the working medium and the degree of dirt on the inner surface of the pipeline. The liquid or gas pipeline with a nominal diameter greater than or equal to 600mm should be manually cleaned, and the liquid pipeline with a nominal diameter less than 600mm should be cleaned manually. Use water to clean the gas pipeline with a nominal diameter of less than 600mm, which should be purged with air. Steam pipes should be purged with steam, and non-thermal pipes should not be purged with steam. The purge is generally carried out in sequence according to the main pipe, branch pipe, and drain pipe.
3. Before the pipeline is purged, a detailed purging plan should be prepared and carried out in sections according to the system
4. The equipment and pipes that are not allowed to be purged are separated from the purging system.
5. After the pipeline is qualified for purging, in addition to the required inspection and restoration work, no other work that affects the cleaning of the pipeline shall be carried out, and the "Pipeline System Purging Record" shall be filled in

Boiler Pipe Purging Steam Blowing Target Plate Mirror Aluminum

Inquiry Cart 0
You May Like
Pipeline Steam Purge 10mm Steam Blowing Target Plate
Pipeline Steam Purge 10mm Steam Blowing Target Plate
Power Plant Purging Aluminum Steam Blowing Target Plate Board
Power Plant Purging Aluminum Steam Blowing Target Plate Board
ISO Alloy Main Target Plate Steam Blowing 10mm
ISO Alloy Main Target Plate Steam Blowing 10mm
A335 P11 High Temperature Alloy Steam Blowing Target Plate
A335 P11 High Temperature Alloy Steam Blowing Target Plate
Al Cu 5mm High Precision Steam Blowing Target Plate
Al Cu 5mm High Precision Steam Blowing Target Plate
API Bolt Rectangle Target Plate For Steam Blowing
API Bolt Rectangle Target Plate For Steam Blowing
55x500x5mm Mirror Polished Aluminum Sheet
55x500x5mm Mirror Polished Aluminum Sheet
10mm Mirror Polished Aluminium Sheet
10mm Mirror Polished Aluminium Sheet
API Polished Aluminum Plate
API Polished Aluminum Plate
Boiler Pipe Steam Blowing Target Plate For Purging And Targeting
Boiler Pipe Steam Blowing Target Plate For Purging And Targeting
High Pressure Purging Mirror Aluminum Target Plate Steam Blowing
High Pressure Purging Mirror Aluminum Target Plate Steam Blowing
Auxiliary Purging Of Boiler Pipe S235JR Steam Blowing Target Plate
Auxiliary Purging Of Boiler Pipe S235JR Steam Blowing Target Plate
Arc Carbon Steel Spray Paint Reinforcement Ring Tank Opening Pipeline
Arc Carbon Steel Spray Paint Reinforcement Ring Tank Opening Pipeline
Mirror Aluminum Steam Blowing Target Plate Customize
Mirror Aluminum Steam Blowing Target Plate Customize
Pipeline Steam Purge Test Sputtering Steam Blowing Target Plate Aluminum
Pipeline Steam Purge Test Sputtering Steam Blowing Target Plate Aluminum